Assembling at site, high masts

Assembling N°.... mast ……… standard, H.... m , at site REGION ................, which consists in the following operations: mechanical assembling of the structure at ground on suitable space; lifting, plumbing and fixing on existing plinth and free from obstacles; mechanical assembling, if any, of the floodlights (if supplied at site, completely assembled, excluding the electric wiring).

Including the supply of wheeled devices needed to handle the structure at site, Handling during the assembling phases and the vertical lifting on the existing plinth and free form obstacles.

In the quotation for the assembling the following items are not included: request of any licenses and permissions, if any; preparation if the foundation plinth; civil work sealing between columns base – foundation plinth; passing of back power lines; electric wiring at the base of the mast; Lighting verification; site setting up; establishment of suitable passages to the devices that will intervene; obstacles removal, if any,; setting up of signage, if any, and authorised operator to direct the traffic; waste disposal; all what it is not clearly mentioned in our offer.

The quotation of the setting up is meant to be valid only in case of continuous service and performance of the above-mentioned operations, and if the job will be done during the day-time and week-day, considering the wide freedom operation for all the devices which will be used for the assembling. The crane in charge for lifting the mast will able to be located nearby the foundation plinth. Any delay or obstacle, not caused by our work, will be calculated and invoiced separately.

If the site come upon not to be suitable, and in general Yours activities are not executed, PaliCampion srl reserves the right to refuse to start the works until the site reaches the agreed conditions.

Document owned by Pali Campion srl. Reproduction is permitted only if the source is cited. Technical data are indicative; final specifications will be stated when ordering.

File details
File name
01 Montaggio in cantiere torre portafari - Assembling at site high masts.doc
Created on
Last modified
SHA-256
d34ba188852bd1a351aef1877154b61c025f2c22e25fdcebaaf562d98644fea2