EC CERTIFICATE OF FACTORY PRODUCTION CONTROL
No.: 0475-CPR-15
In compliance with Regulation (EU) No 305/2011 of the European Parliament and of the Council of 9 march 2011, laying
down harmonised conditions for the marketing of construction products , it has been stated that the construction product
Steel structural component up to EXC 3 in accordance with EN 1090-2
Declaration method : 1 - 2 - 3a - 3b according to table A.1 of EN 1090-1:2009 + A1:2011, Annex A
Fabbrication processes included : Preparation/Assembly - Welding
outsourced : Corrosion protection
excluded : Mechanical fastening
Welding certificate : This certificate is valid only in conjunction with the welding certificate No. 2/IT/802
issued by IIS CERT in accordance with EN ISO 38342
Remarks : None
produced by the manufacturer
PALI CAMPION S.R.L.
VIA ALCIDE DE GASPERI, 45/B - 45025 FRATTA POLESINE (RO)
in the factory
VIA ALCIDE DE GASPERI, 45/B - 45025 FRATTA POLESINE (RO)
is submitted by the manufacturer to the initial type-testing of the product, a factory production control and to the further testing of
samples taken at the factory in accordance with a prescribed test plan and that the notified body IIS CERT (No. 0475) has
performed the initial inspection of the factory and of the factory production control and performs the continuous surveillance,
assessment and approval of the factory production control.
This certificate attests that all provisions concerning the attestation of factory production control described in Annex ZA of the
following Standard were applied.
EN 1090-1:2009 + A1:2011
This certificate was first issued on 15 November 2013 and remains valid as long as the conditions laid down in the technical
specification in reference or the manufacturing conditions in the factory or the factory production control itself are not modified
significantly.
Decision Making Technical
Current issue, 23/07/2018 Authorithy Manager
Revision n. 1
Mr. Giuseppe Perelli Dr. Eng. Stefano Morra
IIS CERT Srl Lungobisagno Istria 29 R - 16141 GENOVA - www.iiscert.it
Corporate Governance Istituto Italiano della Saldatura